







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
ActiveYards Fence Installation: The Dallas Owner’s Guide
ActiveYards fence installation in Dallas typically runs $3,500 to $9,000 fully installed, depending on linear footage, gate count, and whether we’re replacing an existing section or running new line posts. We stock ActiveYards-compatible rails, pickets, post caps, and gate hardware on the truck, and most straight-section installs are completed in a single day once materials are staged. The most common call we get is from a Dallas homeowner whose bottom rail has popped out of the post routing, or whose gate has sagged enough to drag on the concrete patio. It usually starts as a small wobble nobody thinks twice about, then a north Texas storm comes through and the whole panel leans.
We’re an independent Dallas contractor, not affiliated with ActiveYards, but we’ve installed and repaired their aluminum and vinyl systems across the metro for years. The good news is this: ActiveYards is a documented, spec-driven product line. Parts are traceable, and when we quote you a replacement or a new install, the price is written down before a single tool comes out of the truck.
Key Takeaways:
- Fully installed ActiveYards fence in Dallas: $3,500 – $9,000, with the written price locked before work starts.
- We stock compatible rails, pickets, post caps, gate hinges, and latches for quick turnaround.
- Warped or popped rails are the most common ActiveYards failure we see in Texas heat.
- Every completed job carries the 365-Day Done Right Promise in writing.
Which ActiveYards Models This Applies To

ActiveYards produces aluminum and vinyl fence systems across a few core lines, and the part you need depends on which panel style is already in your yard. The most common lines we work on in Dallas are their aluminum spear-top and flat-top residential grades, plus their vinyl privacy panels with routed bottom rails. Post sizes run standard 2-inch or 2.5-inch square, but here’s the gotcha: rail routing depth and picket spacing are not universal across all ActiveYards series, so a rail from one line won’t always seat into a post from another. We check the embossed part number on the post cap or the inside face of the rail before we order anything, because guessing costs you a second trip and a second delivery fee.
For ActiveYards aluminum, the pickets typically slide into a pre-punched rail and lock with a stainless clip. For vinyl privacy panels, the bottom rail is routed to accept the picket and tongue-and-groove assembly. OEM parts are worth it when the section is under five years old and the color code still matches cleanly. On older sections where the paint has weathered, a quality aftermarket powder-coated rail in the same gauge often holds up better in Dallas sun than a factory part that has to match a faded original. We’ll tell you which way makes sense for your specific fence and pull a color sample before we commit.
Styles & brands we work with







Signs Your ActiveYards Fence Installation Is Failing
- Bottom rail popped out of the post routing. This is usually a post that has moved in the ground or a rail that expanded and contracted too many times in Dallas heat. The fix is resetting the post or trimming the rail, not jamming it back in with a shim.
- Gate sagging or dragging on the driveway. The hinge screws have pulled through the post wall, or the post itself has shifted out of plumb. A gate repair kit won’t fix a post that’s moving.
- Pickets rattling or lifting in wind. The retaining clips have corroded or lost tension. On ActiveYards aluminum, this is a five-minute fix with the right clip; on an off-brand imitation, it’s usually a sign the whole rail is spec’d wrong.
- Visible cracks at post base or seams on vinyl panels. Dallas freeze-thaw cycles are hard on vinyl that was installed too tight. Once a panel is cracked, it catches wind and fails further.
- Fence leaning 10 degrees or more after a storm. That’s a foundation problem, not a panel problem. The post footer has failed or the original installer used too little concrete.
See the difference
Before
After
Before
After
Before
AfterReplacement Cost & What’s Included

For a typical Dallas backyard replacement of an existing ActiveYards section, you’re looking at $3,500 to $9,000 depending on how much footage runs, whether we’re pulling and resetting posts, and how many gates need new hardware. On the low end, that’s a straight panel swap with existing posts in solid condition. On the high end, we’re pulling old footers, pouring new ones, rehanging a double gate, and hauling off the old material.
Every quote includes the parts, the labor, the post concrete, the hardware, and the cleanup. There’s no separate trip fee hidden in the final invoice, and there’s no number that moves when the crew shows up. The price we write down before work starts is the price on the invoice when the job is done. If a fence section or gate fails inside the first year under normal use, our 365-Day Done Right Promise means we come back and make it right at no charge. Written, signed, in your hand at close-out.
DIY or Call Us?
Replacing a single picket or tightening an exposed hinge screw is the kind of five-minute job most Dallas homeowners can handle. But if the rail has pulled free, the post is leaning, or the gate won’t sit square, you’re into footer and routing work that goes wrong in a hurry. The real risk is taking a saw to a $150 rail based on a guess, then finding out the replacement doesn’t seat because the series doesn’t match. We’ve fixed enough botched DIY ActiveYards patches to tell you honestly: the first cut is the cheap part. The re-cut is where people lose money.
If you want the corrected part matched and the section set square the first time, call (903) 326-8963 and we’ll come look at the fence, confirm the series, and hand you a written price before anything gets touched.
FAQs

An aluminum ActiveYards fence properly installed in Dallas clay soil will last 20 to 30 years before the rails or posts need real attention. Vinyl privacy panels run closer to 15 to 20 years in full Texas sun before the rails start to chalk and turn brittle. The weak point is almost always the post footer, not the material itself, which is why we pour every new post footer to spec and check drainage before we set a single post.
Yes, and in most cases we recommend repairing rather than replacing. A popped bottom rail, a corroded clip, a sagging gate hinge, or a cracked post cap can all be corrected with the right ActiveYards-compatible part for a fraction of the cost of a new section. We’ll only quote replacement when the rail is structurally compromised or the post footer has failed. Call (903) 326-8963 and we’ll give you the straight answer either way.
A straight section replacement with existing solid posts typically takes one day on site. If we’re pulling footers and pouring new concrete, allow a second day for the concrete to set before we hang the rails and panels. We won’t schedule the second visit until the concrete has cured enough to hold the post plumb.
We carry common ActiveYards-compatible rails, pickets, post caps, hinge sets, and roller latches on our trucks, and we can source series-specific OEM parts through our Dallas supplier network within a few days. We also carry a documented roster of other name-brand materials, including KraftMaid, Cambria, and Silestone, for our kitchen and bath work. If we don’t have the exact color code on the truck, we’ll confirm the part number and give you a written lead time before you commit.
Written by Curtis Lane, Owner, Bradford Remodeling Co Dallas at Bradford Remodeling Co Dallas, serving Dallas and nearby areas.


